Abstract

National Grid needs to maintain a connection between two existing electricity sub-stations (Beddington & Rowdown) in the Croydon (south London) area, and allow the replacement of two 275 kV cable circuits that are buried under roads. This is to be achieved using a single 400 kV cable circuit within a 10 km (6.25 mile) long, 3 m (9.8 ft) diameter high voltage cable tunnel which is being driven through water bearing Chalk, at depths ranging from 5 m (15 ft) to 80 m (262 ft), with four access shafts(12.5 m (41 ft) in diameter) ranging in depth from 10 m (31 ft) to 40 m (131 ft). The Chalk in this area acts as a source of public drinking water supply (PWS) and is protected by areas designated Groundwater Source Protection Zones. To minimise the groundwater risk the design and construction of the cable tunnel and shafts has paid particular attention to the construction materials used, including testing of these construction materials prior to use, developing construction methods (including the design of the Earth Pressure Balance TBM) and maintaining a groundwater monitoring & testing programme prior to and during construction to ensure the integrity of the Chalk aquifer is maintained as a drinking water source. This paper describes the tunnel &shaft design and construction in relation to these particular groundwater environmental issues which set new precedents for tunnel assessment, design and construction requirements in the United Kingdom.
Citation

APA: Colin Rawlings David Keeble John Mathews Christopher Darton Peter Townsend Maria Karakitsiou Russell Bowler Scott Sadler Simon Pepper  (2007)  Outline Design And Construction Of The 10 Km (6.25 Mile) Croydon Cable (High Voltage) Tunnel Through Groundwater Source Protection Zones, United Kingdom

MLA: Colin Rawlings David Keeble John Mathews Christopher Darton Peter Townsend Maria Karakitsiou Russell Bowler Scott Sadler Simon Pepper Outline Design And Construction Of The 10 Km (6.25 Mile) Croydon Cable (High Voltage) Tunnel Through Groundwater Source Protection Zones, United Kingdom. Society for Mining, Metallurgy & Exploration, 2007.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account