Overview of Current Zinc Pressure Leach and Capacity Considerations for the HBM&S Zinc Plant

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 11
- File Size:
- 164 KB
- Publication Date:
- Jan 1, 2008
Abstract
The zinc pressure leach plant at HBM&S's operations is now in its fifteenth year of operation. Current pressure leach operation is steady at a concentrate processing rate of around 26.5 tonnes per hour. A new cellhouse with a design capacity of 124,000 tonnes per annum and the capability of expansion of up to 154,000 tonnes per annum was commissioned in July 2001. The potential to expand the capacity of the pressure leach circuit and associated processes, as well as the purification circuit and casting plant, to meet the maximum capacity of the cellhouse has been investigated. This paper reviews current operation of the zinc plant, as well as the possibility of a capacity increase without major process modifications or major capital expenditures.
Citation
APA:
(2008) Overview of Current Zinc Pressure Leach and Capacity Considerations for the HBM&S Zinc PlantMLA: Overview of Current Zinc Pressure Leach and Capacity Considerations for the HBM&S Zinc Plant. Canadian Institute of Mining, Metallurgy and Petroleum, 2008.