Overview of Current Zinc Pressure Leach and Capacity Considerations for the HBM&S Zinc Plant

Canadian Institute of Mining, Metallurgy and Petroleum
J. Qiu B. Krysa
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
11
File Size:
164 KB
Publication Date:
Jan 1, 2008

Abstract

The zinc pressure leach plant at HBM&S's operations is now in its fifteenth year of operation. Current pressure leach operation is steady at a concentrate processing rate of around 26.5 tonnes per hour. A new cellhouse with a design capacity of 124,000 tonnes per annum and the capability of expansion of up to 154,000 tonnes per annum was commissioned in July 2001. The potential to expand the capacity of the pressure leach circuit and associated processes, as well as the purification circuit and casting plant, to meet the maximum capacity of the cellhouse has been investigated. This paper reviews current operation of the zinc plant, as well as the possibility of a capacity increase without major process modifications or major capital expenditures.
Citation

APA: J. Qiu B. Krysa  (2008)  Overview of Current Zinc Pressure Leach and Capacity Considerations for the HBM&S Zinc Plant

MLA: J. Qiu B. Krysa Overview of Current Zinc Pressure Leach and Capacity Considerations for the HBM&S Zinc Plant. Canadian Institute of Mining, Metallurgy and Petroleum, 2008.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account