Papers - Production - Foregin - Petroleum and Gas in Iran during 1937

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 2
- File Size:
- 52 KB
- Publication Date:
- Jan 1, 1938
Abstract
Gach-Saran.—The most important development of 1937 has been the successful completion of initial exploratory wells in the Gach Saran (formerly known as Gach-i-Qaraghuli) field, about 125 miles southeast of Haft Kel. Two of these wells are rated at 33,000 bbl. per day at flowing pressures exceeding 800 lb. Drilling is proceeding with the object of delimiting the structure. Exploratory drilling is also being undertaken in several areas within the company's concession. In the producing fields the policy of controlled production has been maintained as in the past, and drilling has been limited to that required for maintenance of production and general control of the fields. Acid treatment to increase production when desired has continued to be successful in most cases. Table 1.—Crude Production in Iran Masjid-i-Sulaimana Haft Kel Total Year barrelsb Ton Barrelsb To Barrelab 1936 3,641,247 27,820,000 4,473,849 34,200,000 8,115,096 62,020,000 193P 4,375,112 33,110,000 5,693,849 43,480,000 10,068,961 76,590,000 * Net production; i.e., excluding surplus products re-injected to reservoir. 6 To nearest 10,000. " Correct to November, with an added estimated figure for December. Masjid-i-Su1aiman.—There have been no new developments in this field. The policy of returning, as and when necessary, surplus products to the reservoir has been maintained. Haft Ke1.—Drilling to explore deeper formations has been undertaken, but has not progressed far enough for conclusive results to be drawn. Gasoline retention in the crude by means of multistage pressure stabilization has been continued as in past years. Separation pressures are as follows: well-head separators, 500 lb.; central battery, 190, 85, 40, 20 and 10 lb. per sq. in., respectively. The stabilized crude is delivered to pipe line at atmospheric pressure, or ex the 10-lb. stage, in accordance with refinery requirements.
Citation
APA: (1938) Papers - Production - Foregin - Petroleum and Gas in Iran during 1937
MLA: Papers - Production - Foregin - Petroleum and Gas in Iran during 1937. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1938.