Paste Backfill for Enterprise Mine

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 8
- File Size:
- 665 KB
- Publication Date:
- Jan 1, 1998
Abstract
The cycle time between adjacent stopes is critical to achieving the required production rate from 3500 Orebody; one of the Enterprise Mine orebodies. Current Mt Isa cemented fills require a 90-day cure period which had to be cut to 30 days while maintaining the required strength criteria. The Enterprise Mine Feasibility Study recommended that this be achieved by Cemented Slurry Rock Fill (CSRF), but that on-going research into paste fill be continued. The continuation of the research, in conjunction with overseas visits has recommended that the 3500 Orebody be filled with paste fill, with the potential to fill other orebodies. The paste fill will comprise cyclone and thickener dewatered copper tailings to which Portland Cement (PC) is added before vertical borehole delivery and undergound pipeline reticulation to individual stopes. The benefit is not only re-use of copper tailings but also much reduced binder usage.
Citation
APA:
(1998) Paste Backfill for Enterprise MineMLA: Paste Backfill for Enterprise Mine. The Australasian Institute of Mining and Metallurgy, 1998.