Pend Oreille Mines & Metals Co.

The American Institute of Mining, Metallurgical, and Petroleum Engineers
J. C. Crampton
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
4
File Size:
247 KB
Publication Date:
Sep 1, 1955

Abstract

Gradual shifts in the center of ore production have dictated three moves for the Pend Oreille Mines & Metals Co. plant. Capacity has grown from 300 tpd to the present 2400 tpd, and the gravity process used at the original Josephine mill has long since given way to improved flotation practice. The Josephine mill, operated in World War I and converted to flotation in 1927, treated 200,000 tons of ore rating as high as 16 pct Zn. By 1935 extra ore handling warranted construction of a new mill on a lower level, and capacity was raised from 300 to 800 tpd.
Citation

APA: J. C. Crampton  (1955)  Pend Oreille Mines & Metals Co.

MLA: J. C. Crampton Pend Oreille Mines & Metals Co.. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1955.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account