Performance Of Shotcrete Linings At The Climax Mine

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 14
- File Size:
- 819 KB
- Publication Date:
- Jan 1, 1974
Abstract
Shotcrete drift linings at the Climax Mine of the Climax Molybdenum Company have undergone four years of extensive evaluations as a replacement for thick poured-in-place concrete linings. Any drift lining at Climax must be able to withstand the rigors of undercut and secondary blasting, weight problems induced by panel caving, and the abrasion of slusher mining. Examined here are the conclusions reached so far on shotcrete drift linings which have not yet completed the approximately six-year cycle from development to ore exhaustion. Properly applied shotcrete is an adequate drift lining for all phases of the Climax panel caving system of mining. Undercut blasting will damage shotcrete unless blasts are correctly timed. Weight problems will destroy shotcrete drift linings as efficiently as it will destroy concrete or steel support systems. Abrasion and secondary blasting results are inconclusive as the shotcrete lined slusher drifts have not entered the ore production stage of the mining cycle. In addition to drift linings, Climax has found shotcrete to be invaluable for lining large underground shops, for temporary support systems, for permanent ventilation bulkheads and for the repair of abraded or weight damage concrete lined slusher and haulage drifts.
Citation
APA:
(1974) Performance Of Shotcrete Linings At The Climax MineMLA: Performance Of Shotcrete Linings At The Climax Mine. Society for Mining, Metallurgy & Exploration, 1974.