Pilot Plant Heavy Medium Investigation for Mount Isa Lead/Zinc Ores

The Australasian Institute of Mining and Metallurgy
Di Pasquale S Osler GD
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
10
File Size:
186 KB
Publication Date:
Jan 1, 1978

Abstract

Mount Isa Mines Limited recently commiss ioned an 800 tph Heavy Medium Preconcentration Plant for lead/zinc/silver ores. The decision to build this plant was made in late 1979 based largely on investigations conducted in the Company's pilot plant on a variety of ore types including Hilton ores, between 1972 and 1978. The paper reviews the historical develop- ment of the pilot plant heavy medium circuit through this period and illustrates the extent to which this work impacted on the final design criteria. This review also includes a description of plant operation, manning levels, process equipment and metallurgical performance Achieved.
Citation

APA: Di Pasquale S Osler GD  (1978)  Pilot Plant Heavy Medium Investigation for Mount Isa Lead/Zinc Ores

MLA: Di Pasquale S Osler GD Pilot Plant Heavy Medium Investigation for Mount Isa Lead/Zinc Ores. The Australasian Institute of Mining and Metallurgy, 1978.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account