Pilot Plant Study to Treat Typical Gold Mine Minewater Using the Savmin Process

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 8
- File Size:
- 213 KB
- Publication Date:
- Jan 1, 2003
Abstract
A pilot plant evaluation of the Savmin process, for the purification of mine water was commissioned by Anglogold and conducted at the Stilfontein Gold Mine, Margaret Shaft at Stilfontein in the North West province of South Africa. The purpose of the project was to obtain the operating conditions and operating costs, to produce different qualities of product water, as well as design parameters for upscaling to an industrial plant. The project was undertaken by AngloGold and Mintek of South Africa.
Citation
APA:
(2003) Pilot Plant Study to Treat Typical Gold Mine Minewater Using the Savmin ProcessMLA: Pilot Plant Study to Treat Typical Gold Mine Minewater Using the Savmin Process. The Australasian Institute of Mining and Metallurgy, 2003.