Planning & Design Of New Tailing Disposal Facilities At ZC/NBHC

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 8
- File Size:
- 711 KB
- Publication Date:
- Jan 1, 1983
Abstract
The present The Zinc ODrporation, Limited and New Broken Hill Consolidated Limited (ZC/NBHC) tailing dam (Site C) is expected to reach its terminal capacity late in 1985. Planning and design of new facilities for disposal of tailing after 1985 which includes new tailing dams (Site D) commenced during 1980. This paper briefly describes planning guidelines and specifications, location considerations, environmental aspects, operating strategy, engineering specifications, envirormental aspects and scheduling of works.