Plant Improvement and Cost Reduction at the Great Boulder Proprietary Gold Mines Limited

The Australasian Institute of Mining and Metallurgy
Harris J. W
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
12
File Size:
992 KB
Publication Date:
Jan 1, 1955

Abstract

The treatment plant at The Great Boulder Proprietary Gold Mines Limited was designed and erected by Chas. Ruwolt Proprietary Limited in 1934 to mill 12,000 short tons per month. The flow sheet called for fine grinding, straking, flotation, roasting of the flotation concentrates and cyanidation of the resulting calcine.In 1937 considerable alterations and additions were made to the plant. The grindin,g section was duplicated with addition of two 8 ft. x 6 ft. Abco Ball Mills to increase the throughput to 28,000 tons per month, and the flow sheet was changed from "straight flotation" to "precyanidation and flotation" neeessitating the addition of thickeners, agitators, Oliver filters and Edwards roasters.A further change to the flow sheet was made in 1942 with the introduction of sulphur dioxide conditioning ahead of the flotation section, to permit the treatment of 500,000 tons of oxidised ore. Since that date no major alterations were made to the flow sheet or equipment until 1950, when the modifications set out in this paper were commenced with the object of reducing costs and increasing plant efficiency.These modifications are dealt with under the section headings and are therefore not necessarily in chronological order.CRUSHING SECTIONThere has been no material alteration in this section although at the time of writing a 650 ton capacity ore bin is being erected ahead of the primary Jaques crusher. This bin will reduc'e the crushing time from a three shift to a two shift basis and reduce the labour force required by two men, giving an annual saving of £2,000.FINE GRINDING SECTIONAlterations to the grinding section were commenced in 1950. Prior to this date the grinding flow sheet calle...
Citation

APA: Harris J. W  (1955)  Plant Improvement and Cost Reduction at the Great Boulder Proprietary Gold Mines Limited

MLA: Harris J. W Plant Improvement and Cost Reduction at the Great Boulder Proprietary Gold Mines Limited. The Australasian Institute of Mining and Metallurgy, 1955.