Pre-Ore Modelling: Resource Estimation on a Minimun of Exploration Evidence.

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 4
- File Size:
- 215 KB
- Publication Date:
- Jan 1, 1990
Abstract
A new approach to resource estimation at the exploration stage is emerging, based on the application of simple software techniques. The techniques combine the power of interactive graphics with proven database, analysis and estimation tools. With effective use of these tools the geologist now has maximum chance of deriving a reliable structural and grade model from the limited exploration data. Unlike cutoff-based polygonal methods, the resultant geological model can immediately be used to evaluate any economic scenario.These modelling techniques are embodied in MINEX-3D, an Australian software system. With the emergence of the 386-based PC and high resolution (VGA or better) graphics, MINEX-3D makes the power of this new 'desktop geological modelling' accessible to most exploration geologists.
Citation
APA: (1990) Pre-Ore Modelling: Resource Estimation on a Minimun of Exploration Evidence.
MLA: Pre-Ore Modelling: Resource Estimation on a Minimun of Exploration Evidence.. The Australasian Institute of Mining and Metallurgy, 1990.