Process and Engineering Improvements Increase Production at Hamersley Iron's Pellet Plant

The Australasian Institute of Mining and Metallurgy
Lynch K. S Street R. P
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
10
File Size:
186 KB
Publication Date:
Jan 1, 1973

Abstract

Hamersley Iron's pellet plant at Dampier involves ore drying, dry grind- ing in ball mills, disc balling and, indurating by use of the straight grate system. After five years of operation, the plant's output has been increased from the design capacity level of 2 M.T.P.Y. to 2.5 M.T.P.Y. Steps taken in equipment modifica- tion, improvements in process control, and changes in maintenance procedures are described.
Citation

APA: Lynch K. S Street R. P  (1973)  Process and Engineering Improvements Increase Production at Hamersley Iron's Pellet Plant

MLA: Lynch K. S Street R. P Process and Engineering Improvements Increase Production at Hamersley Iron's Pellet Plant. The Australasian Institute of Mining and Metallurgy, 1973.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account