Process Design Of A Regrind Facility At The Leinster Nickel Operations To Improve Concentrator Recovery (730f9c77-ea3f-4530-b6a8-5498efccd480)

The Southern African Institute of Mining and Metallurgy
Organization:
The Southern African Institute of Mining and Metallurgy
Pages:
7
File Size:
554 KB
Publication Date:
Jan 1, 2007

Abstract

This paper presents the development of a regrind facility design at BHP Billiton's Leinster Nickel Operations (LNO) in Western Australia. The recovery opportunity was identified from an analysis of plant operating data together with scanning electron microscope (SEM) measurements on relevant tailings streams from LNO. A laboratory procedure was developed to determine the potential recovery improvement of installing a regrind facility at LNO. The last step in formulating the process flow sheet and defining the process design criteria was to construct and operate a pilot plant, which incorporated four banks of flotation cells and an Xstrata M20 Isa Mill. Pilot plant on/off trials were used to define the expected metallurgical benefit. A prefeasibility engineering design and cost estimate was completed. Following a successful internal business evaluation, a feasibility study is currently underway.
Citation

APA:  (2007)  Process Design Of A Regrind Facility At The Leinster Nickel Operations To Improve Concentrator Recovery (730f9c77-ea3f-4530-b6a8-5498efccd480)

MLA: Process Design Of A Regrind Facility At The Leinster Nickel Operations To Improve Concentrator Recovery (730f9c77-ea3f-4530-b6a8-5498efccd480). The Southern African Institute of Mining and Metallurgy, 2007.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account