Process Improvements at Placer Dome Campbell Mine

Canadian Institute of Mining, Metallurgy and Petroleum
K. Norris
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
18
File Size:
522 KB
Publication Date:
Jan 1, 1992

Abstract

"The Campbell mill has undergone numerous changes over the past 43 years. However the rate of change has increased significantly in the last 4 years. A new grinding circuit, carbon-in- pulp circuit, pressure oxidation plant, and column flotation circuit are all new additions. Other changes have occurred in the last 2 years including a large reduction in sodium cyanide consumption, and the introduction of a computer controlled grinding circuit. More improvements are planned in the next 2 years. Some of these improvements include the construction of an effluent treatment plant, and the replacement of filtering and Merrill-Crowe precipitation with carbon-in-leach and electrowinning.Recent changes and improvements to the Campbell mill are a commitment by Campbell mill personnel and Placer Dome Inc. to decrease operating costs, increase gold recovery and gold production, improve industrial hygiene and safety, and meet environmental compliance with current government legislation.INTRODUCTIONThe Campbell Mine has been and continues to be one of Canada's premier gold mines. Campbell Mine is 100% owned and operated by Placer Dome Incorporated. Milling of ore commenced in 1949 at a rate of 300 tons/day producing 58,000 ounces per year of gold. In 1992 Campbell Mine will mill 1340 tons/day of ore at a grade of 0.6 ounces/ton, producing 275,000 ounces of gold at a cash cost of $205.00 Cdn./ounce.This paper discusses some of the changes that have been made to the Campbell mill in the past 4 years. The flowsheet has undergone extensive changes and will continue to change rapidly in the next 2 to 3 years. A simplified flowsheet of the Campbell mill is shown in figure 1."
Citation

APA: K. Norris  (1992)  Process Improvements at Placer Dome Campbell Mine

MLA: K. Norris Process Improvements at Placer Dome Campbell Mine. Canadian Institute of Mining, Metallurgy and Petroleum, 1992.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account