Process Selection, Design, Commissioning and Operation of the Sao Bento Mineracao Refractory Gold Ore Treatment Complex

Society for Mining, Metallurgy & Exploration
Edward J. da Silva Alan K. Haines Tarcisio M. Carvalho Marcos P. de Melo Barry N. Doyle
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
11
File Size:
599 KB
Publication Date:
Jan 1, 1989

Abstract

A metallurgical complex to recover gold from highly refractory arsenical ore was recently commissioned by Sao Bento Mineraco. The plant, with a nominal capacity of 20 000 tonnes per month, is situated in the Minas Gerais province of Brazil. The process consists of run-of-mine milling, flotation, pressure oxidation of the concentrate, carbon-in-leach, elution and electrowinning, and effluent disposal. The paper provides an account of the investigations that resulted in the decision to install the pressure oxidation circuit, process and engineering design and plant start up. A comparison is made between the results achieved during the first two years of production and the design parameters.
Citation

APA: Edward J. da Silva Alan K. Haines Tarcisio M. Carvalho Marcos P. de Melo Barry N. Doyle  (1989)  Process Selection, Design, Commissioning and Operation of the Sao Bento Mineracao Refractory Gold Ore Treatment Complex

MLA: Edward J. da Silva Alan K. Haines Tarcisio M. Carvalho Marcos P. de Melo Barry N. Doyle Process Selection, Design, Commissioning and Operation of the Sao Bento Mineracao Refractory Gold Ore Treatment Complex. Society for Mining, Metallurgy & Exploration, 1989.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account