Process Selection, Design, Commissioning and Operation of the Sao Bento Mineracao Refractory Gold Ore Treatment Complex

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 11
- File Size:
- 599 KB
- Publication Date:
- Jan 1, 1989
Abstract
A metallurgical complex to recover gold from highly refractory arsenical ore was recently commissioned by Sao Bento Mineraco. The plant, with a nominal capacity of 20 000 tonnes per month, is situated in the Minas Gerais province of Brazil. The process consists of run-of-mine milling, flotation, pressure oxidation of the concentrate, carbon-in-leach, elution and electrowinning, and effluent disposal. The paper provides an account of the investigations that resulted in the decision to install the pressure oxidation circuit, process and engineering design and plant start up. A comparison is made between the results achieved during the first two years of production and the design parameters.
Citation
APA:
(1989) Process Selection, Design, Commissioning and Operation of the Sao Bento Mineracao Refractory Gold Ore Treatment ComplexMLA: Process Selection, Design, Commissioning and Operation of the Sao Bento Mineracao Refractory Gold Ore Treatment Complex. Society for Mining, Metallurgy & Exploration, 1989.