Producing - Equipment, Methods and Materials - Evaluation of a Stabilizer Charged Gas Lift Valve for Multiple-Phase Flow Using Graphical Techniques: Discussion I

The American Institute of Mining, Metallurgical, and Petroleum Engineers
E. P. Whittemore
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
1
File Size:
85 KB
Publication Date:
Jan 1, 1965

Abstract

Experience with the ASC multipoint gas lift system was obtained in Colonia zone of the West Montalvo field near Oxnard, Calif. The wells in this pool produce from depths varying from 10,500 to 12,000 ft. Oil gravity is generally 14 to 15' API with a few extremes of 12 and 20" API. Some salt water is produced which causes some very viscous emulsions. Viscosities at 150F (which is the approximate wellhead temperature) vary from 5,000 to 100,000 SSU. Most of the production is by gas lift, although a few wells are produced by rod and hydraulic pump. About half of the gas-lift wells are on continuous flow and the remainder are on intermittent lift using large, ported, pilot-operated valves for single-point transfer of gas from casing to tubing. Gas-liquid ratios vary from about 6 to 10 Mcf/bbl of gross fluid lifted. Wells are produced to a 450-psi trap system. The following remarks will be confined to intermittent lift only, since this is the type of lift which has been achieved with the ASC valve system. The maximum gross fluid which has been produced by single-point intermittent lift is about 350 B/D in 3-in. tubing and 200 B/D in 21/2-in. tubing with gas-liquid ratios of approximately 7 to 9 Mcf/bbl. Some design changes could reduce this ratio. The ASC multipoint system has provided production as high as 480 BOPD in 21/2-in. tubing with gas-liquid ratios just under 4 Mcf/bbl. To be able to apply the multipoint system, it is recommended that a detailed explanation be obtained concerning transition-point pressure and stabilizer setting—what its significance is to the string design, how it may work for or against the operation of the well, how it is related to tubing sensitivity and how it affects the unloading operation. The unloading operation may only be of academic interest in a technical paper, but to the production foreman, unloading and setting the valves in operation is a very real problem and should be understood in detail. One item touched lightly in the paper was the unloading valve. This valve controls the maximum pressure at which the well can be operated. When lifting heavy viscous fluids, it is most important to set this valve for the maximum possible realistic operating pressure at the surface. If the well lifts easily, it is simple to set the ASC valves at a lower operating pressure and the unloading valve will remain closed; but if the well happens to be heavier to lift than anticipated, it may be desirable to operate on the unloading valve itself and use all the energy obtainable at the bottom of the hole. In the Colonia pool very heavy wet-gas gradients are experienced due to the viscosity of the liquid and the dense mist which is left behind a slug of fluid. There are many combination strings of 3- and 21/2-in. tubing. This aggravates the wet-gas gradient problem and provides wet-gas gradients of about 50 to 70 psi/1,000. An advantage which multipoint lift has provided is increased slug efficiency through better maintenance of pressure under the slug and decreased fall back as the slug passes up the tubing. By using multipoint injection, wet-gas gradients have been reduced to about 30 psi/1,000. This has reduced bottom-hole operating pressure and given a production increase. The ASC valve is not a simple device. It's operation is difficult to understand, and it must be understood to be used efficiently in gas-lift design. Operating problems are difficult to diagnose—whether they be caused by the fluid lifted, valve malfunction, lift gas rate, or operating pressure. Calculations and reasoning are required to find out what is causing the problem. Inherent in the ASC valve is the inability to create large pressure differentials across a slug. Large differentials may be required to overcome the inertia of very viscous fluid as it is being accelerated in the bottom of the hole. This is tied back to the design of the unloading valve and is one reason for the importance of setting the unloading valve for the highest possible operating pressure. ~u; to the narrow spread the ASC valves provide, it is impossible to cycle slower than about 24 cycles/day on choke control. If small production of 150 BOPD and less is expected, a surface time-cycle controller will be required if the most economical operation is to be achieved. To achieve a satisfactory operation, the operator must keep a record of any changes made in the operating pressure of the ASC valves. Anything which may cause changes in casing pressure in excess of the stabilizer setting will change the valve operating pressure, and if this is not noted from daily inspection of the well casing-tubing pressure recorder charts, the operator will lose control of the well. Significant results can be achieved using ASC valves; however, considerable knowledge is required to design with them, and attention to detail is required for satisfactory field operation.
Citation

APA: E. P. Whittemore  (1965)  Producing - Equipment, Methods and Materials - Evaluation of a Stabilizer Charged Gas Lift Valve for Multiple-Phase Flow Using Graphical Techniques: Discussion I

MLA: E. P. Whittemore Producing - Equipment, Methods and Materials - Evaluation of a Stabilizer Charged Gas Lift Valve for Multiple-Phase Flow Using Graphical Techniques: Discussion I. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1965.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account