Production Blasting Practice at Hamersley Iron Pty. Limited

The Australasian Institute of Mining and Metallurgy
McTavish LP Kaleta S Turner RD
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
13
File Size:
641 KB
Publication Date:
Jan 1, 1978

Abstract

Primary production blasting at Hamers- ley Iron began with seven inch holes at Tom Price in 1966 and has developed since then to large multiple row shots of 381 mm holes at Tom Price and 311 mm at Paraburdoo. Up to 1.3 million tonnes are initiated in a single blast with the average around 300,000 tonnes. Development can be traced through Anfo, AlAnfo, slurries, various boosters, initiation and delay techniques, hole loading and daily operating practices. A standard practice could be developed for the two mines for normal pro- duction blasts; this would not apply to such common variations as low "paddy" shots, pre- splitting, tight corners necessitating single row drilling etc. Because of ground variation three or even four sizes of drill holes may well be economic- al for blasting, even though this would be off set by complications in operation, supervision, store stocking and maintenance, particularly in Drilling.
Citation

APA: McTavish LP Kaleta S Turner RD  (1978)  Production Blasting Practice at Hamersley Iron Pty. Limited

MLA: McTavish LP Kaleta S Turner RD Production Blasting Practice at Hamersley Iron Pty. Limited. The Australasian Institute of Mining and Metallurgy, 1978.