Production Planning Systems At The Hanna Mining Company - Production Planning Systems At Hanna

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 7
- File Size:
- 384 KB
- Publication Date:
- Jan 1, 1984
Abstract
Hanna has developed three production planning systems to help the mine engineers determine the sequence of mining from available ore supples. The Production Scheduling System was developed to give the staff a tool for long range planning by sequencing the removal of blocks from an open pit property. It was needed to determine the year of removal for each block so that the optimum present-valued pit limits could be established by our pit design program. Since in this type of planning short term grade control is less of a factor than it is in daily or monthly planning, the system gives the program greater control and more latitude in block selection. It permits only full blocks to be taken.
Citation
APA:
(1984) Production Planning Systems At The Hanna Mining Company - Production Planning Systems At HannaMLA: Production Planning Systems At The Hanna Mining Company - Production Planning Systems At Hanna. Society for Mining, Metallurgy & Exploration, 1984.