Productivity Analysis of the Table Formwork Method for Making a Cost-Efficient Equipment Input Plan

Canadian Institute of Mining, Metallurgy and Petroleum
J. B. Kwon
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
10
File Size:
1238 KB
Publication Date:
Aug 1, 2013

Abstract

For improvement in the productivity of tall building projects, table formwork is one of the main methods that have been adopted for slab formwork. Because the table formwork method is an equipment-oriented construction method, the type of lifting equipment and method of operation considerably affects the productivity and cost of the table formwork. It is also important to make an equipment input plan for completing the table formwork within the time given, according to the structural construction cycle. For performing the table formwork, a tower crane or an independent lifting system, and shifting trolleys, are required. However, if an inefficient equipment input plan is made, exorbitant cost may be incurred. Therefore, the purpose of this study is to analyze the productivity of a table formwork, considering the type and number of lifting equipment and the number of trolleys inputted, and to suggest quantitative data for making a cost-efficient equipment input plan within the construction duration given. It is expected that the results of this research will be utilized as a basis for cost-efficient equipment input planning.
Citation

APA: J. B. Kwon  (2013)  Productivity Analysis of the Table Formwork Method for Making a Cost-Efficient Equipment Input Plan

MLA: J. B. Kwon Productivity Analysis of the Table Formwork Method for Making a Cost-Efficient Equipment Input Plan. Canadian Institute of Mining, Metallurgy and Petroleum, 2013.