Progess Report on Grinding at Tennessee Copper Company

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 4
- File Size:
- 336 KB
- Publication Date:
- Jan 11, 1950
Abstract
This second progress report of grinding presents comments regarding ball consumption and data pertaining to the hydroscillator, which is closed circuited with the tricone mill. A study and postulate of how balls function is presented. The paper summarizes cost reduction obtained by the method of "grinding for the tail race" rather than for "mesh tons."
Citation
APA:
(1950) Progess Report on Grinding at Tennessee Copper CompanyMLA: Progess Report on Grinding at Tennessee Copper Company. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1950.