Quantifying Geotechnical Risk in the Mine Planning Process

The Australasian Institute of Mining and Metallurgy
T P. Medhurst
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
8
File Size:
197 KB
Publication Date:
Jan 1, 2000

Abstract

In many cases mine design is the most important driver of the profitability of a mining project, however to reach an æoptimumÆ mine plan many compromises have to be made. Some of the fundamental profit (and loss) drivers relate to stoping methods and stope design parameters. Inevitably trade-offs have to be made between the stability of underground openings, ground support costs and production efficiency. This paper looks at the role of geomechanics in the mine planning and design process. The concepts of æcontrollable lossesÆ and æuncontrollable lossesÆ are developed as a means of partitioning ground control costs. A stope design example is given which provides a method of examining mining costs, and includes a decision making element in order to quantify geotechnical impacts and select stope dimensions. The method also provides a general framework as a means of balancing ground control costs against maximising returns from an underground mining project.
Citation

APA: T P. Medhurst  (2000)  Quantifying Geotechnical Risk in the Mine Planning Process

MLA: T P. Medhurst Quantifying Geotechnical Risk in the Mine Planning Process. The Australasian Institute of Mining and Metallurgy, 2000.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account