Radioisotope Gauges Control Filter Feed At The Grace Mine

The American Institute of Mining, Metallurgical, and Petroleum Engineers
George W. Sheary
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
3
File Size:
296 KB
Publication Date:
Jan 5, 1962

Abstract

Situated 45 miles west of Philadelphia and 50 miles southwest of Bethlehem Steel Company's Bethlehem plant, the integrated Grace mine facilities produce 4000 tpd of high-quality iron ore pellets. Startup of the Grace mill was in November 1958, and iron concentrates were shipped until March 1960, when the pellet plant went into operation. The underground mine, when fully developed, will hoist about 9000 tpd, including development rock. The crude ore, which has an iron content of approximately 42%, is magnetically cobbed and crushed in closed circuit with 3/4-in. slotted vibrating screens. The ore is washed and screened in the mill and the plus 1/4 in. screen product is again cobbed prior to feeding to the rod mills. Grinding is done in rod mills, and in ball mills that are in closed circuit with 30 in, cyclones, to 1% on 100 mesh and 65% minus 325 mesh. The ground ore is magnetically concentrated by three-drum permanent type finisher magnets to 67% Fe. The magnetite concentrate is pumped from the mill to a 50 ft thickener in the pellet plant. The thickened magnetite concentrate is relayed to the filters through a two-stage pump arrangement. The filter cake is fed by belt from filter concentrate bins to mixer-muller belts where it is intimately mixed with bentonite and a slight amount of water for moisture control. The fluffed concentrate then drops into balling cones. The green pellets from the balling cones are fed in a prescribed feed pattern to shaft furnaces through the use of shuttle car mechanisms. The green pellets are dried, heated to 2500°F and cooled to 1200°F as they descend through the furnace and into pellet coolers where the pellets are further reduced in temperature to 250°F. Heat is recovered in the cooling process through the use of air-to-air heat exchangers. The cooled pellets discharge on a rubber conveyor belt and are transferred to 6000-ton pellet railroad loading bin. The final pellet product consists of 90% plus 1/4 in. material (after tumble testing1) and contains 66% Fe plus 3% silica.
Citation

APA: George W. Sheary  (1962)  Radioisotope Gauges Control Filter Feed At The Grace Mine

MLA: George W. Sheary Radioisotope Gauges Control Filter Feed At The Grace Mine. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1962.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account