Rapid Underground Development Optimisation At Cullinan Diamond Mine Using Computer Simulation

- Organization:
- The Southern African Institute of Mining and Metallurgy
- Pages:
- 14
- File Size:
- 2287 KB
- Publication Date:
- Jan 1, 2010
Abstract
There are many underground mining software tools available to plan and schedule the development of underground mines. A shortfall of these tools is the optimization of the underground equipment and strategy in order to maximize the development rate. This paper will illustrate how the SimMine® software was used to maximize underground development at Petra Diamonds' Cullinan Diamond Mine. It will also determine the effect of various development strategies and equipment capacities on the underground development rate and pinpoint potential bottlenecks in the mine development cycle.
Citation
APA:
(2010) Rapid Underground Development Optimisation At Cullinan Diamond Mine Using Computer SimulationMLA: Rapid Underground Development Optimisation At Cullinan Diamond Mine Using Computer Simulation. The Southern African Institute of Mining and Metallurgy, 2010.