Recent Bureau Of Reclamation Experience In Tunnel Construction By Contract

Society for Mining, Metallurgy & Exploration
William R. Groseclose Cecil E. Tackett
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
11
File Size:
369 KB
Publication Date:
Jan 1, 1974

Abstract

Since 1965 when the first mole was used on Bureau work, the Bureau of Reclamation has completed 17 tunnels of over 5,000 feet in length. The longest was 12.8 miles. Total length of the 17 tunnels was 376,207 feet, or over 71 miles. The finished diameter varied from 7 feet 0 inch to 18 feet 0 inch with 82 percent (58 miles) being less than 12 feet 0 inch in diameter when lined. All of these tunnels except one are gravity flow, water conveyance tunnels with relatively flat gradient. One is a low-head pressure tunnel. All were constructed by contracts resulting from fixed-price bids. Starting in 1964 the Bureau of Reclamation initiated the practice of giving several options in the specifications on methods of tunnel excavation. Since that time, construction work has been completed on 17 tunnels. Of this number, 11 were mole excavated and 6 were excavated by conventional drill and blast methods. In general, there has been 2 feet of mole excavation for every 1 foot of drill and blast. Cost comparisons are based on only 13 tunnels because the Bureau has 4 recently completed tunnels that have pending claims; therefore, final cost data are not available. Some definite trends show from the data available; however, the number of completed tunnels in some categories is so small the results cannot really be considered a trend. As more data become available, the indications will become more reliable. The information is presented to indicate general trends and comparisons and cannot be meaningfully used for a one-on-one comparison because of individual tunnel differences not considered.
Citation

APA: William R. Groseclose Cecil E. Tackett  (1974)  Recent Bureau Of Reclamation Experience In Tunnel Construction By Contract

MLA: William R. Groseclose Cecil E. Tackett Recent Bureau Of Reclamation Experience In Tunnel Construction By Contract. Society for Mining, Metallurgy & Exploration, 1974.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account