Recent developments in the zinc plant of the Hudson Bay Mining and Smelting Company Limited

Canadian Institute of Mining, Metallurgy and Petroleum
G. J. Desroches
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
6
File Size:
4210 KB
Publication Date:
Jan 1, 1988

Abstract

"In order to improve zinc plant productivity, areas of low efficiency were identified. As a result, solution purification was improved, additional dust precipitator capacity was made available and a new zinc casting plant was installed. The effects of these and other changes are discussed and the expenditure and benefits reviewed. HistoryThe operation of the Flin Flon metallurgical complex including an electrolytic zinc plant commenced in October 1930. The design of the zinc plant was based on that of the Commonwealth Mining and Smelting Company at Trail, British Columbia, the Anaconda Great Falls Montana Plant and the Electrolytic Zinc Company plant at Risdon, Tasmania.The plant began with a design capacity of 60 tons per day and currently produces 255 tons per day. Since plant start-up, approximately 3.5 million ton s of zinc metal have been produced, most of it exceeding special high-grade specifications.IntroductionThe facility incorporates the basic process steps of roasting, leaching, purification, electrowinning and casting. Figure I details the flowsheet. During the late 1970s, management recognized that in order for the zinc plant to continue operating, it was necessary to introduce cost-effective practices.Study groups, consisting of design engineers and operations personnel, were formed to investigate the details of plant revisions.The objectives were to improve productivity by reducing manual labour, reducing energy usage, increasing zinc recovery, increasing metal output and reducing costs.This paper details the changes made during the period 1979to 1986 and shows how these changes have affected the productivity and economics of the zinc plant operation."
Citation

APA: G. J. Desroches  (1988)  Recent developments in the zinc plant of the Hudson Bay Mining and Smelting Company Limited

MLA: G. J. Desroches Recent developments in the zinc plant of the Hudson Bay Mining and Smelting Company Limited. Canadian Institute of Mining, Metallurgy and Petroleum, 1988.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account