Reclamation by Sluicing of Tailing Impounded in a Valley at Electrolytic Zinc Company of Australasia Ltd., Rosebery, Tasmania

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
8
File Size:
4516 KB
Publication Date:
Jan 1, 1973

Abstract

A unique sluicing process for recovering tailing impounded in a valley was developed by Electrolytic Zinc Company of Australasia Ltd., West Coast Mines, Rosebery, Tasmania.Earthmoving equipment could not be used as most of the material to be recovered was semi-fluid. A conventional sluking method was also impracticable as there was no suitable working face from which the process could be commenced.Operations started from a flat surface, using special techniques for sinking through the tailing and establishing producing working faces as the sinking process continued.After about 2 years the bottom of the dam was reached and conventional sluicing methods could be used.
Citation

APA:  (1973)  Reclamation by Sluicing of Tailing Impounded in a Valley at Electrolytic Zinc Company of Australasia Ltd., Rosebery, Tasmania

MLA: Reclamation by Sluicing of Tailing Impounded in a Valley at Electrolytic Zinc Company of Australasia Ltd., Rosebery, Tasmania. The Australasian Institute of Mining and Metallurgy, 1973.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account