Reclamation by Sluicing of Tailing Impounded in a Valley at Electrolytic Zinc Company of Australasia Ltd., Rosebery, Tasmania

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 8
- File Size:
- 4516 KB
- Publication Date:
- Jan 1, 1973
Abstract
A unique sluicing process for recovering tailing impounded in a valley was developed by Electrolytic Zinc Company of Australasia Ltd., West Coast Mines, Rosebery, Tasmania.Earthmoving equipment could not be used as most of the material to be recovered was semi-fluid. A conventional sluking method was also impracticable as there was no suitable working face from which the process could be commenced.Operations started from a flat surface, using special techniques for sinking through the tailing and establishing producing working faces as the sinking process continued.After about 2 years the bottom of the dam was reached and conventional sluicing methods could be used.
Citation
APA: (1973) Reclamation by Sluicing of Tailing Impounded in a Valley at Electrolytic Zinc Company of Australasia Ltd., Rosebery, Tasmania
MLA: Reclamation by Sluicing of Tailing Impounded in a Valley at Electrolytic Zinc Company of Australasia Ltd., Rosebery, Tasmania. The Australasian Institute of Mining and Metallurgy, 1973.