Recovery Optimisation at Oaky Creek Coal

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 10
- File Size:
- 669 KB
- Publication Date:
- Jan 1, 1990
Abstract
A simple production technique has been initiated and implemented at Oaky Creek open cut coal mine to optimise recovery of coal from the relatively thin geological seams. The production technique is based upon minimising coal dilution through careful dragline operation and the selective use of mine mobile equipment to clean the top of coal. In addition, recovery of coal from the pits has been increased by refining blasting and dragline methods.The implementation of the recovery optimisation programme at Oaky Creek has provided significant economic benefits from increased yield through the preparation plant by the reduction in dilution, and from increased raw coal tonnage through improved pit recovery methods.
Citation
APA: (1990) Recovery Optimisation at Oaky Creek Coal
MLA: Recovery Optimisation at Oaky Creek Coal. The Australasian Institute of Mining and Metallurgy, 1990.