Rehabilitation and Expansion of the Central City Tunnel System in Minneapolis, MN

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 7
- File Size:
- 297 KB
- Publication Date:
- Jun 1, 2019
Abstract
"The city of Minneapolis contracted with CDM Smith to update and provide a conceptual design for improvements to mitigate surcharge flooding in the Central City Storm Water Tunnel System (CCSTS). As a part of the project, CDM Smith conducted a field survey and condition assessment of the existing tunnel system. Information from the survey was then used to update the existing XPSWMM model and develop system wide alternatives.The CCSTS provides storm-water runoff drainage for nearly the entire area of the city’s downtown commercial district. The system consists of deep storm-water tunnels constructed in the St. Peter Sandstone, approximately 21 m (70 ft) below the street’s surface. The primary tunnels comprising the Central City storm water tunnel system are located below Hennepin Avenue, Nicollet Mall, Lesalle Avenue, Marquette Avenue South, 2nd Avenue South, South 5th Street, Washington Avenue South, Portland Avenue South, 2nd Street South, and Chicago Avenue South, as shown in Fig. 1. This network of tunnels conveys the runoff from a 305-acre tributary area that is generally bound by Hennepin Avenue and 1st Avenue North to the east, 12th Street to the south, 4th Avenue South and 7th Avenue South to the west, and 2nd Street South. These tunnels were constructed between 1936 and 1940, except for the Marquette Avenue South tunnel, which was constructed between 1963 and 1964.The CCSTS operates as a gravity flow system. These tunnels were constructed within the St. Peter Sandstone layer of bedrock and emerge from the bedrock at the Mississippi River below St. Anthony Falls. The Central City and the adjacent Chicago Avenue tunnel system converge into a single outfall at the Mississippi River. The runoff discharges from the converged outfall to a side channel of the Mississippi River, called a tailrace, located near the Guthrie Theater. The Minneapolis Division of Surface Water and Sewers provided 32 historic plats detailing the plan and profile of the tunnel system.The tunnel plans show nine different cross-section configurations. Eight configurations within the overall system generally show the same geometric “cathedral” shape with the inside dimensions varying from 1.2 to 1.8 m (4 to 6 ft) in width and 1.8 to 2.4 m (6 to 8 ft) in height. For analysis, these eight configurations were reduced to three configurations with regards to tunnel liner, cross-sectional area and support. For simplicity, the three configurations are described according to the three types of tunnel support used during construction: none required, light timber and heavy timber"
Citation
APA:
(2019) Rehabilitation and Expansion of the Central City Tunnel System in Minneapolis, MNMLA: Rehabilitation and Expansion of the Central City Tunnel System in Minneapolis, MN. Society for Mining, Metallurgy & Exploration, 2019.