Abstract
DURING the past year the Committee on Coal and Coke has been collecting data concerning various points in the bituminous industry about which a large amount of misinformation circulates through the press and, in some cases, through the coal trade papers. The data presented have been compiled by various members, from the most authentic sources available, and where possible cover the period 1913-1924. They will enable comparisons to be made within the industry, and of this and other industries, and will explain some of the differences between conditions existing now and in the prewar period. CAPACITY AND OVER-DEVELOPMENT The capacity of bituminous mines is frequently stated at figures ranging between 800,000,000 to 1,400,000,000 tons per year. Table 1 shows statistics for the industry, mainly from U. S. Geological Survey sources but partly from U. S. Coal Commission reports. Column 3 gives the mine capacity with equipment and labor as of given date, as estimated from the data published by the U. S. Geological Survey. This is calculated for each State by obtaining the total man days worked as. reported by the operators (multiplying average men employed by total days worked at each mine) and dividing this figure into the total production, getting the production per man day; this figure times number of men employed times 308 (a theoretical full working year) equals estimated- full-time capacity. Two major objections are made to this method-one that the total number of men employed is used, instead of the number actually working, and the other that the number of days used only deducts Sundays and five holidays. The first objection is answered by the fact that the same number of men is used in estimating capacity as is used in actual production, and while this number is always from 12 to 20 per cent. more than are actually working, this condition exists at all times, although it is worse at times of maximum output. Few coal men will agree with the conclusion that the use of 308 days is correct, as it is practically impossible to keep any mine working full time at the same
Citation
APA: (1926) Report Of Coal And Coke Committee, American Institute Of Mining And Metallurgical Engineers
MLA: Report Of Coal And Coke Committee, American Institute Of Mining And Metallurgical Engineers. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1926.