Reserve And Ultimate Pit Limit Design Analysis Of Caldagi Nickel Deposit, Turkey

Society for Mining, Metallurgy & Exploration
Serkan Saydam Ercument Yalcin
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
11
File Size:
440 KB
Publication Date:
Jan 1, 2002

Abstract

This paper presents the results of Caldagi Nickel-Cobalt Ore Deposit's, located in Turkey, reserve and ultimate pit limit design analysis. Reserve analysis of any deposit requires two steps. First one is to constitute of block model of the deposit and second step is to generate ultimate pit limit. The block model of the Caldagi ore deposit has been created by means of geostatistics. The reserves of nickel and cobalt in this block model are defined as resource, approximately 12 million tons of nickel and 1 million tons of cobalt with average grades of 0.9% Ni and 0.03% Co, respectively. Ultimate pit limit analysis has been performed by considering economic, technical and legal factors. In this paper, the ultimate pit limits are generated by Lerchs & Grossmann (L&G) algorithm. As a consequence of ultimate pit limit design, total amount of tonnage to be excavated is 1.4 billions of tons, 700 million of which contains ore and 747 million of which is the tonnage of waste.
Citation

APA: Serkan Saydam Ercument Yalcin  (2002)  Reserve And Ultimate Pit Limit Design Analysis Of Caldagi Nickel Deposit, Turkey

MLA: Serkan Saydam Ercument Yalcin Reserve And Ultimate Pit Limit Design Analysis Of Caldagi Nickel Deposit, Turkey. Society for Mining, Metallurgy & Exploration, 2002.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account