RI 8048 Evaluation of an 8-Foot-Diameter Flexible Liner Installation in the Burgin Mine, Eureka, Utah

- Organization:
- The National Institute for Occupational Safety and Health (NIOSH)
- Pages:
- 17
- File Size:
- 2222 KB
- Publication Date:
- Jan 1, 1975
Abstract
The use of flexible liners for support of underground openings has been investigated by the Bureau of Mines. This report presents installation procedures and instrumentation results of a full-scale flexible liner field installation in the Burgin mine. The flexible liner is a part of the mine support system and has provided maintenance-free support for 22 months
Citation
APA:
(1975) RI 8048 Evaluation of an 8-Foot-Diameter Flexible Liner Installation in the Burgin Mine, Eureka, UtahMLA: RI 8048 Evaluation of an 8-Foot-Diameter Flexible Liner Installation in the Burgin Mine, Eureka, Utah. The National Institute for Occupational Safety and Health (NIOSH), 1975.