RI 8286 Foam Stimulation To Enhance Production From Degasification Wells in the Pittsburgh Coalbed (496337e6-c62a-4837-bf40-2e8fc9f8d2fb)

- Organization:
- The National Institute for Occupational Safety and Health (NIOSH)
- Pages:
- 13
- File Size:
- 587 KB
- Publication Date:
- Jan 1, 1978
Abstract
Seven degasification wells have been completed in the Pittsburgh coalbed at the new Emerald mine near Waynesburg, Pa. Funding was provided by the Bureau of Mines to perform stimulation treatments on five of the wells, to show that this is a feasible and economical means of degasifying part of a coalbed. The seven wells ranged in depth from 590 to 910 feet. Stimulation treatments used 25,260 to 42,660 gallons of foam and 7,400 to 12,800 pounds of 20/40-mesh prop sand. Pumping rates were 10.8 to 11.6 bbl/min and treating pressures were from 1,050 to 1,600 psig. On the day following stimulation, gas production ranged from a few hundred cubic feet per day to more than 100,000 cu ft/day.
Citation
APA:
(1978) RI 8286 Foam Stimulation To Enhance Production From Degasification Wells in the Pittsburgh Coalbed (496337e6-c62a-4837-bf40-2e8fc9f8d2fb)MLA: RI 8286 Foam Stimulation To Enhance Production From Degasification Wells in the Pittsburgh Coalbed (496337e6-c62a-4837-bf40-2e8fc9f8d2fb). The National Institute for Occupational Safety and Health (NIOSH), 1978.