RI 8577 - Methane Drainage Study Using an Underground Pipeline, Marianna Mine 58

The National Institute for Occupational Safety and Health (NIOSH)
L. J. Prosser G. L. Finfinger J. Cervik
Organization:
The National Institute for Occupational Safety and Health (NIOSH)
Pages:
34
File Size:
3929 KB
Publication Date:
Jan 1, 1981

Abstract

The Bureau of Mines has completed an underground degasification project in which an underground piping system was used to transport methane from the coalbed to the surface. In a 10-month period four horizontal holes were drilled to an average depth of 1,450 feet. All four holes were surveyed vertically and azimuthally. In 991 days of degasification, 255 MMcf of gas was drained from the coalbed. The underground piping system proved to be a safe and effective means of transporting methane from the coalbed to the surface.
Citation

APA: L. J. Prosser G. L. Finfinger J. Cervik  (1981)  RI 8577 - Methane Drainage Study Using an Underground Pipeline, Marianna Mine 58

MLA: L. J. Prosser G. L. Finfinger J. Cervik RI 8577 - Methane Drainage Study Using an Underground Pipeline, Marianna Mine 58. The National Institute for Occupational Safety and Health (NIOSH), 1981.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account