Rise and Pillar Rill Stoping at Golden Crown Mine

The Australasian Institute of Mining and Metallurgy
Rogers M Sullivan B
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
4
File Size:
387 KB
Publication Date:
Jan 1, 1993

Abstract

Golden Crown Mine is a narrow vein gold mine producing 75000 tpa. Production has been predominantly by shrink stoping using hand held machine and airleg. Bogging from these stopes is done with Toro 150 LHD units.Previously the standard development method consisted of developing a sill drive, a footwall drive and millholes every 7 m. This meant that for every metre of ore development, 2 m of waste development was required.
Citation

APA: Rogers M Sullivan B  (1993)  Rise and Pillar Rill Stoping at Golden Crown Mine

MLA: Rogers M Sullivan B Rise and Pillar Rill Stoping at Golden Crown Mine. The Australasian Institute of Mining and Metallurgy, 1993.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account