Rock Breaking on the Melbourne Undergroudn Rail Loop

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
17
File Size:
1398 KB
Publication Date:
Jan 1, 1978

Abstract

Techniques and results achieved during the excavation of the Melbourne Underground Rail Loop (HURL) are summarised and discussed in the context of the various restraints present in a typical urban construction project. Mechanical methods (as distinct from those utilising blasting)accounted for the bulk of the excavation. Ground support was critical in this particular geological excavation setting, but is not discussed in detail except insofar as it constitutes a restraint to excavation progress.
Citation

APA:  (1978)  Rock Breaking on the Melbourne Undergroudn Rail Loop

MLA: Rock Breaking on the Melbourne Undergroudn Rail Loop. The Australasian Institute of Mining and Metallurgy, 1978.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account