Rock Mass Response And Machine Performance In A Full-Face TBM Tunnel In Rochester, NY

Society for Mining, Metallurgy & Exploration
Fred H. Kulhawy Malcolm J. McPhersqn T. D. Rourke
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
23
File Size:
940 KB
Publication Date:
Jan 1, 1981

Abstract

From mid-1976 to early 1978, a 5.64 m diameter tunnel, 2491 m long, was excavated by a modified Robbins full-face TBM under shallow cover in highly stressed sedimentary rock in Rochester, NY. In-situ stress measurements were made, and tunnel behavior was monitored with MPBXs, inclinometers, tape extensometers, and instrumented steel ribs. Detailed geologic mapping was also done. In this paper, the as-monitored tunnel behavior is described, and the TBM performance is evaluated from field records. Recommendations are also made for future tunneling in similar geologic environments.
Citation

APA: Fred H. Kulhawy Malcolm J. McPhersqn T. D. Rourke  (1981)  Rock Mass Response And Machine Performance In A Full-Face TBM Tunnel In Rochester, NY

MLA: Fred H. Kulhawy Malcolm J. McPhersqn T. D. Rourke Rock Mass Response And Machine Performance In A Full-Face TBM Tunnel In Rochester, NY. Society for Mining, Metallurgy & Exploration, 1981.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account