Rock Mass Response And Machine Performance In A Full-Face TBM Tunnel In Rochester, NY

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 23
- File Size:
- 940 KB
- Publication Date:
- Jan 1, 1981
Abstract
From mid-1976 to early 1978, a 5.64 m diameter tunnel, 2491 m long, was excavated by a modified Robbins full-face TBM under shallow cover in highly stressed sedimentary rock in Rochester, NY. In-situ stress measurements were made, and tunnel behavior was monitored with MPBXs, inclinometers, tape extensometers, and instrumented steel ribs. Detailed geologic mapping was also done. In this paper, the as-monitored tunnel behavior is described, and the TBM performance is evaluated from field records. Recommendations are also made for future tunneling in similar geologic environments.
Citation
APA:
(1981) Rock Mass Response And Machine Performance In A Full-Face TBM Tunnel In Rochester, NYMLA: Rock Mass Response And Machine Performance In A Full-Face TBM Tunnel In Rochester, NY. Society for Mining, Metallurgy & Exploration, 1981.