Rock Slope Remediation on the Pennsylvania Turnpike Bedford, Pennsylvania

- Organization:
- International Society of Explosives Engineers
- Pages:
- 13
- File Size:
- 373 KB
- Publication Date:
- Jan 1, 2001
Abstract
This paper describes rock slope remediation performed along America’s first Superhighway, the Pennsylvania Turnpike and in particular, the specialized drilling equipment designed and built by Pacific Blasting to complete this work. This S-month project was performed on an existing rock cut slope within the Bedford Narrows, a gap formed by the Juniata River through Evitts Mountain. These rocks are in the folded Juniata and Tuscarora Formations within the Valley and Ridge Province and strike northeast with near vertical to slightly overturned bedding.