Roof Pressure Monitoring Using The Integrated Longwalt Automation System By WESTFALIA

International Conference on Ground Control in Mining
Ulrich Paschedag
Organization:
International Conference on Ground Control in Mining
Pages:
6
File Size:
1339 KB
Publication Date:
Jan 1, 1994

Abstract

The WESTFALIA group of companies developer and manufactures underground mining machinery for complete high-performance longwalls. WESTFALIA uses a state of the art electrohydraulic system as the most important component for the realisation of today's fully automated plow or shearer longwall. The shield control unit (SCU) allows maximum custom designed software flexiblity as well as maximum hardware reliability. The master control unit (MCU) monitors shield support data as well as the plow/shearer position. By using an industry standard PC in an explosion-proof box with an intransically safe keyboard nearly unlimited software capabilities can be obtained with inexpensive hardware. Among various other modes of operation this MCU allows the monitoring and recording of data which can be transmitted to a surface computer. Production and operational adjustments can be made by the mine management based on the MCU information. Statistical analysis of the distribution of roof pressure under various conditions is also possible. The WESTFALIA automation system PM-4 gives the operator maximum flexibility and helps the mine management to run their longwall more efficiently and safely.
Citation

APA: Ulrich Paschedag  (1994)  Roof Pressure Monitoring Using The Integrated Longwalt Automation System By WESTFALIA

MLA: Ulrich Paschedag Roof Pressure Monitoring Using The Integrated Longwalt Automation System By WESTFALIA. International Conference on Ground Control in Mining, 1994.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account