Abstract
"The Pierre Beauchemin Mine attained commercial production in January 1989, and went on to produce 23 968 ounces of gold for the year, 3% higher than forecast. Underground development was accelerated to prepare the way for the production of an estimated 40 000 ounces in 1989.IntroductionThe Pierre Beauchemin Mine is located nine miles west of the city of Rouyn-Noranda (Fig. I).As a result of the amalgamation with Sullivan Mines in October 1987, the mine is now entirely owned by Cambior Inc.The Eldrich deposit was discovered in 1953and began production in 1955, closing in 1962 following the decrease in gold prices and the simultaneous decrease in silica content in the ore, which was sold to the Noranda smelter for flux. A total of 717 000 tons grading 0.14 oz Au/t were produced during this period.From July 1984 to October 1987, an underground exploration program was carried out by Sullivan on the Eldrich mining concession and the nearby Flavel property. The first phase of the program included reinstallation of surface facilities and dewatering of the Eldrich Mine. Following the completion of the first phase, extensive exploration was carried out, including a major program of diamond drilling. It was then decided to deepen the shaft to a depth of 1800 ft to access a new zone called the No.5 Zone .Following the amalgamation with Sullivan in October 1987, Cambior assumed the role of operator for the project, and continued the shaft deepening work that had already been started. A feasibility study was completed in April 1988 and the Cambior board of directors approved a production decision for the Eldrich-Flavel project.The preproduction program extended from May to December 1988 and was aimed at preparing the stopes in the upper part of the mine and at developing the mine infrastructure at the bottom of the mine.The mine was officially opened in August 1988. Cambior renamed the project the Pierre Beauchemin Mine in recognition of Pierre Beauchemin's pioneer-work."
Citation
APA: (1990) Rouyn-Noranda Division
MLA: Rouyn-Noranda Division. Canadian Institute of Mining, Metallurgy and Petroleum, 1990.