SAG Mill Pilot Testing Of A High-Clay Silver Ore At Gumuskoy, Turkey

Society for Mining, Metallurgy & Exploration
A. C. T. Bigg N. K. Bodur Y. Kocak
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
9
File Size:
354 KB
Publication Date:
Jan 1, 2000

Abstract

The Gumuskoy silver mine, owned by the Etibank, in the province of Kutahya, Turkey, has been operating since 1987 with primary, secondary and tertiary crushers, and two parallel single stage ball mill circuits. Continuing problems with crushing and feeding of the ore to the ball mills, because of the moisture retaining and sticky nature of the ore, prompted an investigation into the possibility of converting the grinding circuit to an autogenous or semiautogenous grinding circuit. This would remove the bottleneck associated with the secondary and tertiary crushing. At the same time the target feedrate is to be raised from 140 t/h to 175 t/h. This paper demonstrates the response of five ore types, and blends of ore types in an onsite pilot plant test program, and also suggests how the variations can be handled in a SAG mill/ball mill circuit incorporating just one of the present ball mills.
Citation

APA: A. C. T. Bigg N. K. Bodur Y. Kocak  (2000)  SAG Mill Pilot Testing Of A High-Clay Silver Ore At Gumuskoy, Turkey

MLA: A. C. T. Bigg N. K. Bodur Y. Kocak SAG Mill Pilot Testing Of A High-Clay Silver Ore At Gumuskoy, Turkey. Society for Mining, Metallurgy & Exploration, 2000.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account