Sampling and Sample Preparation Systems for Hamersley Iron Ore Products at the Port of Dampier

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 9
- File Size:
- 569 KB
- Publication Date:
- Jan 1, 1976
Abstract
Sampling and sample preparation systems at the Hamersley Iron Pty. Limited port of Dampier, W.A., were developed for two separate objectives. 1. The need for rapid determination of physical properties. On stream size analysis enables lump ore and pellet- ized ore physical properties to be monitored and controlled whilst shiploading is in progress. As a control procedure this facility allows optimum shiploading rates con sistent with physical quality control. 2. The need for accurate chemical analysis. Chemical analysis on ship- loading forms the final link in overall quality control procedures encompassing the operation of mining, railway and port blending. Thus maintenance of specification products with minimum variation in chemical characteristics is ensured.
Citation
APA: (1976) Sampling and Sample Preparation Systems for Hamersley Iron Ore Products at the Port of Dampier
MLA: Sampling and Sample Preparation Systems for Hamersley Iron Ore Products at the Port of Dampier. The Australasian Institute of Mining and Metallurgy, 1976.