San Vicente to 2nd Aqueduct Pipeline - Tunnel: Drill and Blast in Advance of an Open-Face Digger Shield

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 9
- File Size:
- 756 KB
- Publication Date:
- Jan 1, 2008
Abstract
The San Vicente to 2nd Aqueduct Pipeline?Tunnel project is a raw water conveyance tunnel linking the San Vicente Reservoir (SVR) to the 2nd Aqueduct Pipeline via Rancho Penasquitos Pressure Control Facility (RPPCF). This 58,230 lf long tunnel will be 8.5? final ID, and has four points of construction access. The job is classified into 6 Reaches of tunnel, identified by the dominant geology within the reach. This paper will focus on Reach 3, specifically the measures necessary to drill and blast a 550 lineal foot section of granitic rock tunnel immediately in front of an open face digger shield.
Citation
APA:
(2008) San Vicente to 2nd Aqueduct Pipeline - Tunnel: Drill and Blast in Advance of an Open-Face Digger ShieldMLA: San Vicente to 2nd Aqueduct Pipeline - Tunnel: Drill and Blast in Advance of an Open-Face Digger Shield. Society for Mining, Metallurgy & Exploration, 2008.