Sao Paulo Metro Project?Control Of Settlements In Variable Soil Conditions Through EPB Pressure And Bicomponent Backfill Grout

Society for Mining, Metallurgy & Exploration
Lorenzo Pellegrini
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
17
File Size:
565 KB
Publication Date:

Abstract

The respect of EPB reference pressure during TBM advance and hyperbaric activities, the complete and effective filling of the annular gap between tunnel lining extrados and the excavation section and a well organized monitoring system, to control surface settlements and ground distortion, are items of utmost importance in EPB tunnelling process. The paper describes how these concepts have been applied while excavating in the difficult underground conditions found at Sao Paulo (Brazil) during the execution of the Sao Paulo Metro Line 4-Lot 1. In this project, the annular gap has been filled by two components type, cement grouting. The back feed of the extensive monitoring campaign carried out to check the surface settlements during the excavation and hyperbaric maintenance operations will also be described in the paper.
Citation

APA: Lorenzo Pellegrini  Sao Paulo Metro Project?Control Of Settlements In Variable Soil Conditions Through EPB Pressure And Bicomponent Backfill Grout

MLA: Lorenzo Pellegrini Sao Paulo Metro Project?Control Of Settlements In Variable Soil Conditions Through EPB Pressure And Bicomponent Backfill Grout. Society for Mining, Metallurgy & Exploration,

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account