Scheduling Of Excavation For Underground Powerhouses

Society for Mining, Metallurgy & Exploration
L. J. Cousineau A. Geoffrion
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
20
File Size:
710 KB
Publication Date:
Jan 1, 1983

Abstract

In underground powerhouse excavations, the access to the horizontal sections of the penstocks is most often critical. Other factors which influence the schedule include: the sequences of excavation, the interface dates between contracts, the type of support for the overhead cranes and whether the roof in the powerhouse is a reinforced concrete arch or a suspended prefabricated material. At Outardes 3, Churchill Falls and LG-2, these factors, along with the size of the powerhouse and the local topgraphy and geology were studied to produce the optimum schedule.
Citation

APA: L. J. Cousineau A. Geoffrion  (1983)  Scheduling Of Excavation For Underground Powerhouses

MLA: L. J. Cousineau A. Geoffrion Scheduling Of Excavation For Underground Powerhouses. Society for Mining, Metallurgy & Exploration, 1983.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account