Seismic Design Evaluation of the Bay Tunnel

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 10
- File Size:
- 1308 KB
- Publication Date:
- Jan 1, 2008
Abstract
The 5-mile long Bay Tunnel is a major water supply facility to be constructed under the San Francisco Bay and adjacent marshlands between the San Andreas Fault to the west and the Hayward Fault to the east. The tunnel will have a two-pass lining system consisting of a watertight precast concrete segmental initial lining and a welded steel pipe final lining. Considering the Bay Tunnel?s location between two major active faults, the design earthquake produces a significant peak ground acceleration estimated at approximately 0.6g. To develop a design that can achieve the seismic performance objectives, full dynamic seismic analyses were performed using site-specific earthquake time histories. The analyses considered soil-structure interaction and an evaluation of the transverse and longitudinal effects of the design earthquake. This paper describes the seismic analyses and the design measures recommended to minimize potential adverse effects of the design earthquake on the tunnel final lining.
Citation
APA:
(2008) Seismic Design Evaluation of the Bay TunnelMLA: Seismic Design Evaluation of the Bay Tunnel. Society for Mining, Metallurgy & Exploration, 2008.