Abstract
"The semi-pilot scale plant for injection smelting of zinc calcine was operated under the committee of Joint Research Organization of Injection Metallurgy. The capacity of the plant is 10 ton metallic zinc per day. The plant was designed by the resul ts of basic and bench scale tests of the capacity of 1 ton metallic zinc per day which was published at ""Zinc '85"". The equipments of the plants, operational conditions, results of the operation such as recovery of zinc in injection furnace and condenser, combustion rate of powdered coke and consumption of energy in this process are presented in this paper. The results of the study of the feasibility of the commercial plant of 100,000 ton zinc per year by the injection smelting are also discussed in the paper. IntroductionThe research committee of new smelting process of zinc by injection was established in 1981 under the finantial support of Mining Promoting Foundation of Japan. Six zinc producing companies joined in this organization. The price of zinc was very low at that time and the energy cost, especially, cost of electric power in Japan was extremely high. Invention of a new economical process for zinc extraction had been stronglydesired. The author proposed a injection smelting of zinc as a economical process in energy saving after a calculation of thermodynamical equilibrium and heat balance(1 )(2).The research committee has been studying the injection process since 1981. The small basic experiment by using a crucible furnace was carried out from October 1981 to March 1983 and the reaction of reduction of calcine by injection smelting was ascertained (2). Vaporizatipon of zinc and behaviours of impurities were examined. After the basic experiment, the bench scale test with the production capacity of zinc of 1 ton per day was carried on from November 1983 to October 1984.The bench scale tests were carried out to obtain the proper design of feeding devices of calcines and coke into a furnace and also to obtain fundamental data for enlargement of this smelting process(3,4). The recovery of metallic zinc in this small equipments was about 50% and main loss of zinc was formation of dross in the condenser."
Citation
APA:
(1988) Semi-Pilot Plant Test for Injection Smelting of Zinc CalcineMLA: Semi-Pilot Plant Test for Injection Smelting of Zinc Calcine. The Minerals, Metals and Materials Society, 1988.