"The Ohio River Bridge East End Crossing Tunnel requires a 75-year service life of its cast-in-place reinforced concrete lining. This twin-tube 3-lane (each tube) highway tunnel is about 55-ft wide and 30-ft high. Since unified tunnel service life prediction methodology does not exist in the US, challenges occurred during the design-build phase of this project. These challenges include the methodologies in determining the reinforced concrete’s degradation mode, the lining’s surface chloride concentration level, the reinforcing steel’s critical chloride threshold value for corrosion, how to verify the concrete’s diffusion coefficient, and the durability impact from concrete crack width. This paper presents a methodology in verifying the proposed concrete mix can achieve the service life requirements. This methodology can be adopted for service life prediction for future tunnels to be built in the US. INTRODUCTION The Ohio River Bridge East End Crossing (ORBEE) Tunnel is part of a Public Private Partnership project, which connects transportation network between Louisville, Kentucky and southern Indiana. Located in Louisville, Kentucky, the twin-tube highway tunnel provides northbound and southbound lanes of the Kentucky approach to a new bridge across the Ohio River. Tunnel lengths are approximately 1,675-ft and 1,685 for the northbound tube and the southbound tube, respectively. Connected by two cross-passages, both tubes have a roadway width of 40-ft, for 3-lane traffic, and a vertical clearance of 26.5-ft.The tunnel was constructed by drill and blast method with shotcrete and rock dowels as initial ground supports. The final tunnel lining system includes: •,Nominal 16” cast-in-place reinforced concrete lining, with 2” and 3” concrete covers over reinforcing steel for its extrados and intrados, respectively. •,20” cast-in-place reinforced concrete invert slab, with 4” and 3” concrete covers over reinforcing steel on its top face and bottom face, respectively. •,PVC waterproofing system around tunnel perimeter, excluding invert slab. •,Perforated PVC groundwater collection pipes on both sides of the tubes and one below the invert slab of each tube."
Citation
APA: (2016) Service Life Prediction for the Ohio River Bridge East End Crossing Tunnel
MLA: Service Life Prediction for the Ohio River Bridge East End Crossing Tunnel. Society for Mining, Metallurgy & Exploration, 2016.