Shaft Sinking at the Cassidy Shaft Mount Charlotte

The Australasian Institute of Mining and Metallurgy
Mulroney D Doyle P
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
17
File Size:
1578 KB
Publication Date:
Jan 1, 1985

Abstract

The Cassidy Shaft was sunk to access the Mount Charlotte and Reward Orebodies below the Flanagan Fault. The 1,184m deep shaft is concrete lined to 6.5m diameter for its full depth. The initial 590m was excavated by stripping into a 1.8m diameter borehole and hoisting the broken material through the existing mine. The remaining 594m was excavated by conventional shaft sinking methods. The shaft was sunk through 3 existing plats and an additional 8 plats cut. 1,800 tonnes of steel and 8 cables were installed during the furnishing of the 4 compartments.
Citation

APA: Mulroney D Doyle P  (1985)  Shaft Sinking at the Cassidy Shaft Mount Charlotte

MLA: Mulroney D Doyle P Shaft Sinking at the Cassidy Shaft Mount Charlotte. The Australasian Institute of Mining and Metallurgy, 1985.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account