Shafts And Tunnels: Damen Avenue To Roosevelt Road

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 7
- File Size:
- 334 KB
- Publication Date:
- Jan 1, 1979
Abstract
Damen Avenue to Roosevelt Road, the Tunnel and Reservoir Plan (TARP), a Deep Tunnel Project for the Metropolitan Sanitary District of Greater Chicago consists of 25,189 lin. ft. of 32 ft. tunnel with 1 ft. 0 in. concrete liner throughout. The 17,100 ft. main tunnel connects at both ends with two other Deep Tunnel contracts. A branch tunnel connecting to the mainstream tunnel, commences approximately 4,140 ft. from the construction shaft and runs 8,089 ft. south and terminates at the Racine Avenue Pumping Station. Shaft work consists of one 28 ft. 6 in. diameter construction shaft, one 3 ft. 6 in. diameter access shaft and 25 drop shafts-four of which have vent shafts. The drop shafts vary in diameter from 4 ft. 0 in. to 17 ft. 0 in. All shafts vary in depth to invert from 225 ft. to 235 ft. Work has been underway for 16 months and as of this writing the construction shaft and access shaft are complete. Seven shafts have been excavated and concreting operations have started in four of them. The starter tunnel is complete, the mining machine has mined 250 lin. ft. and the muck removal system is in full operation. The contractor for the project is a joint venture of Paschen/Morrison-Knudsen/Kenny. Paschen Contractors, Inc., Chicago, Illinois is the sponsor. The total contract amount is $107,837,300.00.
Citation
APA:
(1979) Shafts And Tunnels: Damen Avenue To Roosevelt RoadMLA: Shafts And Tunnels: Damen Avenue To Roosevelt Road. Society for Mining, Metallurgy & Exploration, 1979.