Sheppard Subway Twin Tunnels Project

Society for Mining, Metallurgy & Exploration
Murray Malott
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
13
File Size:
1176 KB
Publication Date:
Jan 1, 1999

Abstract

The Sheppard Subway extension is currently being constructed in Toronto, Canada for the Toronto Transit Commission (TTC). McNally International Inc., in a joint venture with PCL and the Foundation Company of Canada were awarded the Twin Tunnels contract of the Sheppard extension. The Twin Tunnels project is approximately 4.4 km in length and consists of two separate twin bore drives each 3.3 km and 650 m in length and approximately 400 m of cut and cover construction. This paper presents a case history of the construction of the soft ground tunnels through the complex Toronto glacial deposits using two 5.9 m outside diameter Lovat earth pressure balance (EPB) tunnel boring machines.
Citation

APA: Murray Malott  (1999)  Sheppard Subway Twin Tunnels Project

MLA: Murray Malott Sheppard Subway Twin Tunnels Project. Society for Mining, Metallurgy & Exploration, 1999.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account